The Critical Path
Where did the decision-making critical path page move?
This route points to The Critical Path, the canonical principle for finding the shortest route to value.
Checks
- Does the route point to the canonical Critical Path principle?
- Does the destination explain the shortest route to value?
Failure Modes
- Duplicate critical-path canon — editing this route instead of the canonical principle.
- Path drift — optimizing a side route while the value path stays blocked.
Context
- The Critical Path — canonical principle
- Decision Routes — fork, obstacle, sign, bridge
- Performance — proof that the route moved value
Questions
What is the shortest route from here to valuable proof?
- What dependency determines the minimum time to value?
- What work is off the critical path?