Skip to main content

Vision / Chart a Course

Chart a Course

Most people know something has shifted. Fewer name it. Almost no one designs their response.

The maps and tools already exist. The lifeboat can be built before the push comes. This is the instrument for that.

The Call

The game worth playing is not the one you inherited.

Sport teaches this early. The feedback is immediate, honest, and just. You win by reading the game — not by complying with rules written for someone else's benefit.

Picture the ideal. Measure the gap. The distance between those two is where the journey lives.

Read the game, design your play, build a crew who sharpens you, return with better maps for the next player.

Current Position

19%
Feature Coverage
45/234 features
$0
Monthly Revenue
Target: $8,000 by Sep
1
Underway
1 blocked
9
Total Waypoints
1 completed

Passage Plan

9 waypoints linking priorities, ventures, and features. Each waypoint has a kill signal — the condition that means stop and rethink.

WP-1Underway
40d overdue

Admin Portal L3

Hex fix deployed. All screens dogfooded. Orgs active.

admin-portal
dreamineeringprettymint
AUTH-001AUTH-002AUTH-008AUTHZ-001USER-002USER-003

Unlocks agency demo — working admin to show prospects

Kill: B6-B12 gaps block multi-org by Apr 11

WP-2Blocked
37d overdue

Data Footprint Live

Table health, row counts, schema coverage visible on production.

data-footprint
dreamineeringstackmates
AGNT-003

Proves platform substance — differentiator in agency pitch

Kill: Blocked by hex arch coupling — LlamaCloud import

WP-3Planned
36d overdue

Agency Offer Live

Service defined. Solar365 outreach sent. Pipeline exists.

dreamineeringprettymint

First prospect contacted — pipeline > 0

Kill: No prospect response by Apr 15 → pivot offer

WP-4Planned
26d overdue

First Dollar

Kill signal fired Apr 30. No signed client. Re-evaluating agency model — Solar365 still active pipeline at 4.58.

sales-crm
dreamineering
CRM-001CRM-002

$2,500-5,000/mo retainer

+$2,500/mo

Kill: No signed client by Apr 30 → re-evaluate agency model

WP-5Completed
40d overdue

Berley in the Water

Week 1 berley shipped Apr 30. Content funnel restarted.

marketing-site-generator
berleytrails
MKTG-001

Attention funnel restarts after 5+ weeks dark

Kill: No draft by Apr 3 → defer to next week

WP-6Planned
5d overdue

Prompt Deck L2

5-card builder with saved data. Edit flow. Seed content for all ventures.

prompt-deck
stackmatesdreamineeringbetterpractice
AGNT-001AGNT-002

Core product visible — Stackmates becomes demonstrable

Kill: Agency revenue not covering costs → pause product

WP-7Planned
2d

Time+Mind L2

Calendar dogfooded 2 weeks. 3 filed issues resolved.

time-mind
dreamineeringstackmates
PM-001PM-002

Internal tool → agency upsell for client time management

+$500/mo

Kill: Not dogfooded by May 9 → deprioritize

WP-8Planned
16d

Second Client

Second agency client signed. Revenue sustainable.

dreamineeringprettymint

$5,000-10,000/mo covers all costs + surplus

+$2,500/mo

Kill: No inbound interest by May 23 → content strategy failing

WP-9Planned
47d

Stackmates Beta

VSaaS product live. 3 ventures using it. Feature matrix 25%+.

prompt-decktime-mindbetter-practice
stackmates

Product revenue layer — funded by agency surplus

+$1,000/mo

Kill: Agency not profitable by Jun 1 → defer to Q4

Provisions

Can we make it to the next port? Six-month cash flow projection tied to waypoint delivery.

MonthRevenueCostsNetCumulative
Apr 2026$0$85$-85$-85
May 2026$0$85$-85$-170
Jun 2026$5,000$100+$4,900$4,730
Jul 2026$6,000$100+$5,900$10,630
Aug 2026$7,000$120+$6,880$17,510
Sept 2026$8,000$120+$7,880$25,390
Revenue Trajectory$25,390 cumulative by 2026-09
04
05
06
07
08
09

The stories that shape the journey

Questions

What waypoint, if it slipped, would make the rest of the plan unreadable?

  • Which kill signal is most likely to fire — and have you designed what comes after it?
  • If you could only reach three waypoints by June, which three matter most — and does the answer change if you weight cash flow over features?
  • What waypoint is missing — the one not yet plotted that would change everything?