Skip to main content

How did we arrive at this proposal — and how do we track that value is delivered?

MapQuestionKey Finding
Outcome MapWhat does success look like?4 binary measures. 80% built, gap is wiring not architecture.
Value Stream MapWhere does time die?~10% flow efficiency — developer intervention on every onboard. Second user flow is a dead end.
Dependency MapWhat must happen first?3 hard deps (all Tier 0), parallelizable. Blocks every downstream PRD.
Capability MapWhat can we actually do?14 capabilities: 4 at maturity 4, 4 at zero. 22% checklist passing.
A&IDHow do agents orchestrate?4 agents, 6 instruments, 4 loops. Auth loop working, authz loop broken — sensor bypassed, actuator missing.

Templates: Pictures Templates

The Bridge

Pictures sit between sales and engineering. The prompt deck sells the vision. These five maps prove the thinking is sound.

Prompt Deck (sells)Pictures (explains)
"The owner can't get in"Outcome: 4 binary success measures
"789 errors, zero revenue"Value Stream: ~10% flow efficiency, dead end for second user
"80% built, 0% working"Capability: 14 capabilities, 4/14 at maturity 4, architecture flows
"Every venture waits"Dependency: 3 hard deps, all parallelizable
"Builder locked out"A&ID: auth loop works, authz loop broken, 5 JTBD, role definitions

Context