Skip to main content

How does value flow — and where does time die?

Flow Efficiency: ~2% — 5 hours work in 16 days. And Step 5 never happens.

Full ASCII diagram
VALUE STREAM MAP: PROMPT DECK
════════════════════════════════════════════════════════════

[TRIGGER: Too many priorities — new venture, new quarter, life crisis]


┌──────────────────┐
│ 1. CAPTURE │ C/T: 60min Wait: 0 %C&A: 50%
│ Write everything │
│ down (whiteboard,│
│ Notion, Miro) │
└────────┬──────────┘
│ (no wait — happens in the same session)

┌──────────────────┐
│ 2. COMPRESS │ C/T: 30min Wait: 1-3d %C&A: 30%
│ Try to pick what │
│ matters. Energy │
│ drops. Meeting │
│ ends. │
└────────┬──────────┘
│ ░░░░░░░░░░░░░ (1-3 days: energy drops, no structure forces completion)

┌──────────────────┐
│ 3. DOCUMENT │ C/T: 3hrs Wait: 1-3d %C&A: 20%
│ Slides, plan, │
│ business doc. │
│ Blank page. │
└────────┬──────────┘
│ ░░░░░░░░░░░░░ (1-3 days: procrastination, blank page problem)

┌──────────────────┐
│ 4. SHARE │ C/T: 30min Wait: 3-7d %C&A: 40%
│ Present to team, │
│ board, investors │
└────────┬──────────┘
│ ░░░░░░░░░░░░░░░░░░░░░░░░ (3-7 days: scheduling, format mismatch)

┌──────────────────┐
│ 5. UPDATE │ C/T: never Wait: ∞ %C&A: 0%
│ Try to maintain. │
│ Fails. │
│ Always fails. │
└────────┬──────────┘


[OUTPUT: Frozen artifact. Clarity decays. Repeat next quarter.]

Cycle Time: ~5 hours (actual work)
Wait Time: ~11 days (energy drops + procrastination + scheduling + forgetting)
Lead Time: ~16 days (trigger to shared artifact)
Flow Efficiency: 5h / 16 days ≈ 2%

World-class: >40% Good: 20-40% Typical: 5-15% CURRENT: ~2%

THE REAL PROBLEM: Step 5 never happens. Every existing tool creates
clarity once, then the artifact freezes. No return mechanism. No
comparison. No compounding. The waste isn't in creation — it's in decay.

════════════════════════════════════════════════════════════

Bottlenecks

RankStepWaitRoot CauseInstrument Fix
1UpdateInfiniteNo mechanism to return, compare, iterateWeekly snapshot comparison + gap highlighting
2Compress1-3 daysEnergy drops after capture, no structure forces completion5x5 constraint forces compression in-session
3Document1-3 daysBlank page problem, procrastinationGrid IS the document — filling is documenting
4Share3-7 daysScheduling, format mismatch (they expect slides)Share link: read-only grid, no slides needed
5Capture0 waitEverything captured but nothing structuredFive columns force structured capture from start

Seven Wastes

WasteCurrentWith Instrument
Waiting11 days of gaps between stepsFill + snapshot in one session. Return in 10 min.
ReworkRemake slides before every meetingLiving deck — grid IS the slide
Overproduction40-page plans nobody reads25 cells max. Constraint prevents overproduction.
InventoryMultiple versions across tools (Notion, Docs, Miro, photos)One grid. One source of truth. Snapshots for history.
Over-processingBeautiful slides that freeze on creationNo slides. Fill cells. Gaps visible. Done.

Target State

  With instrument:
Step 1: FILL — Open Prompt Deck, fill 25 cells C/T: 20 min
Step 2: GAPS — See empty cells highlighted C/T: instant
Step 3: RETURN — Weekly, compare snapshot C/T: 10 min
Step 4: COMPOUND — Grid evolves each pass C/T: ongoing

Per session: ~30 min
Frequency: weekly (vs quarterly)
Decay: zero (grid persists, snapshots compare)

The bottleneck shifts from "can't maintain clarity" to
"do I return weekly?" That's why D7 > 35% is the kill metric.

Gate

Before moving to Dependency Map:

  • All 5 steps documented with cycle time — YES
  • Wait time measured between each step — YES (0 to infinite)
  • Flow efficiency calculated — YES (2% current)
  • Bottlenecks identified and ranked — YES (5 ranked, #1 is the infinite wait)
  • Waste types categorized — YES (5 of 7 present)
  • Target state defined — YES (30 min/week, continuous vs quarterly)

Context