Skip to main content

Business Platform Requirements

Table order = build order. Top row is what engineering builds next. Each PRD advances features from the RaaS catalog.

New features = new PRD, never expanding an existing one. The Commissioning Dashboard tracks every feature by catalog ID.

Requirements by Piping Generation

Every requirement advanced the platform's capability to pipe information, value, or intent. Use the generations to see where a requirement sits in the stack.

Read the Protocol →

Gen 1: Information

Removing permission to publish. Hyperlinks pipe documents and APIs.

Project Management SystemCONNECTED
CLI PlatformCONNECTED
Sales CRMCONNECTED
ETL Data ToolCONNECTED
WorkChart BridgeCONNECTED
RFP EngineCONNECTED
Multi-Tenant RoutingCONNECTED
Agent PlatformCONNECTED
Protocol CoverageCONNECTED
Prompt DeckCONNECTED
Decision TracerCONNECTED
Solar RFP PipelineCONNECTED
Marketing SitesCONNECTED
Sales Dev AgentCONNECTED
Prediction Game (Sui)CONNECTED
Autoresearch LoopCONNECTED
Better PracticeCONNECTED
Design SystemCONNECTED
Automated CommissioningCONNECTED
Demand Signal ScoringCONNECTED
Time + MindCONNECTED
Admin PortalCONNECTED

Gen 2: Value

Removing permission to transact. Smart contracts pipe assets and proofs.

No active projects

Gen 3: Intent

Removing permission to delegate. Agent protocols pipe decisions and negotiation.

No active projects

Prepare

2.0–2.914 PRDs

Sales CRM

L2-L3

Vertical CRM for construction — native entities, pipeline visibility, follow-up tracking.

2.9/5
Score
deal_activation_rate > 0.60Pipeline + overview L4. Contacts partial. Calendar broken.
Blocked: S0: Wire algorithms + Stripe webhooks

ETL Data Tool

L2

Data acquisition + readiness platform.

2.8/5
Score
count(businesses WHERE trust_score) >= 1008 pipelines live. NZBN + Crawl4AI.
SpecMaps

WorkChart Bridge

CONVEYOR
L0

Bridge dream repo work charts to engineering execution engine — blueprints become running code.

2.7/5
Score
workchart_stage_automation_rate > 0.6PRD written. 9 work charts, 9 workflows, zero connection.

RFP Engine

L2

Compounding answer library — answer once, auto-fill forever, win rate climbs.

2.7/5
Score
auto_fill_rate > 0.50Venture kanban live. Answer library empty. Auto-fill returns nothing.
Blocked: Answer library has 0 approved entries

Multi-Tenant Routing

L0

Customer org signs in and sees only their data via URL-scoped routes.

2.6/5
Score
solar365_sees_only_their_data = trueDB ready. Auth adapter partial. URL routing missing. Blocks Solar365.

Agent Platform

PUMP
L2

Identity, memory, scaffold generators, boundary enforcement — the PUMP that powers the factory.

2.6/5
Score
agent_first_task_seconds < 30v2.2: 5 features (PUMP-001-005). 14 absorbed. Plans UI, scaffolds, boundaries, patterns, memory.

Protocol Coverage

GAUGE
L0

Every protocol interface provably correct — trust computed, not claimed.

2.5/5
Score
protocol_coverage_percent >= 80v2.2: 5 features (PROT-001-005). 20/49 tested (41%). Commerce Auth Chain has 3 broken links.

Prompt Deck

L1

Pitch+prompt conviction engine — inner sell then outer sell.

2.5/5
Score
pages_using_promptdeck >= 20Component live, 15 implementations.

Decision Tracer

GAUGE
L0

Durable traces of the 'why' behind every priority change.

2.5/5
Score
untraced_policy_exceptions = 0Spec drafted, ready for engineering.
DeckSpecMaps

Solar RFP Pipeline

L0

Enquiry → CRM → AI design → BOM → costed proposal. Same day, not same week.

2.5/5
Score
proposal_within_10pct_of_manual_quote = truePRD written. CRM + RFP shells exist. Zero solar content, no BOM, no pricing.

Marketing Sites

L0

Hybrid sites + trojan horse diagnostics for qualified lead capture.

2.4/5
Score
sales_team_lead_quality >= 7Spec drafted. Sneakers partnership.

Sales Dev Agent

L2

AI-powered demand generation.

2.3/5
Score
discovery_calls_this_month >= 5Dashboard live.
DeckSpecMaps
Blocked: prd-agent-platform

Prediction Game (Sui)

L0

Atomic settlement proof: PTBs, zkLogin, oracles, Dynamic NFTs.

2.3/5
Score
predictions_settled_atomically >= 50Spec drafted. 5 feature IDs frozen.

Autoresearch Loop

CONDUCTOR
L0

Chain skills into overnight autonomous loops.

2.1/5
Score
prd_full_cycles_per_month >= 17 skills span 2 repos, none chain.

Inner Loop

The control system between Dream and Engineering. These run continuously — the PUMP, GAUGE, and CONTROLLER of the factory P&ID.

RolePRDFunctionStatus
SYSTEMProject Management Systemthings-table PM across cadencesL2-partial
INSTRUMENTCLI PlatformOne binary (drmg) with shared platform lib, repository-only DB access, agent-grade contracts.L4
CONVEYORWorkChart BridgeBridge dream repo work charts to engineering execution engine — blueprints become running code.L0
PUMPAgent Platformidentity, memory, comms, dispatchL2
GAUGEDecision Tracerdurable traces of the 'why'L0
CONDUCTORAutoresearch Loopchains skills into overnight loopsL0
CONTROLLERAutomated Commissioningtest results → feature statesL0

Pipeline

  • Backlog — 4 PRDs scored and spec'd, next in line
  • Backlog — 12 PRDs parked until demand pulls them forward
  • Completed — 6 PRDs (3 consolidated + Identity & Access + Multimodal Agent + CLI Platform)

Process

Research demand versus capability to execute. Balance attention vs intentions to optimize where you focus time and energy.

StepWhatLink
1. FrameExtract core pain, vision, metrics, appetiteJTBD Framework
2. SpecSIO + Story Contract + Build Contract + Screen ContractsPRD Development
3. Score5P Priority (Pain x Demand x Edge x Trend x Conversion)Scoring Algorithm
4. CommissionL0→L4 maturity model, flight readinessCommissioning

Context

Questions

What capability are you building by hand today that should be shared infrastructure tomorrow?

  • If every venture on this network could compose from the same primitives, what would you build that's currently impossible?
  • Which row in the Active table would you kill — and what does that reveal about your actual priorities?
  • What's the cost of the gap between what's specified and what's commissioned?