Skip to main content

Pre-Flight Maps

Did we think this through before building?

MapQuestionKey Finding
Outcome MapWhat does success look like?Everything depends on Sprout Phase 1 passing first
Value Stream MapWhere does time die?150+ hours manual → ~1 hour generated (150x)
Dependency MapWhat must happen first?Single-thread critical path through Sprout → Phase 1 scoring → Phase 2 ops
Capability MapWhat can we actually do?9 of 14 capabilities at maturity 0-1 — schema exists, logic doesn't
A&IDHow do agents orchestrate?VFL Scorer and Optimal Stopping Gate are the two critical instruments

The Bridge

LayerWhat It ContainsLink
Prompt Deck5 headlines compressed from these mapsFast loop
PicturesThis page — the thought processYou are here
SpecEngineering depth justified by these mapsSlow loop

The pictures prove the spec isn't opinion. The prompt deck proves the pictures are communicable.

Context