Skip to main content

Flow Diagrams

Five maps. Each one answers a question. Each answer feeds the next question. By the end, the PromptDeck is named as an instrument in the system language.

1 of 5

What does success look like?

OUTCOME MAP
═══════════════════════════════════════════════════════════════════════

  A person compresses their world into five priorities on one page.
  The empty cells become their strategy.
  They return weekly to update it.

       │
       ├── What exists                          ├── What blocks
       │   ├── CDD prototype (5 patterns)       │   ├── Zero external users
       │   ├── Figma template (visual done)     │   ├── "What if I pick the wrong five?"
       │   ├── 1,200+ pages prove the pattern   │   ├── People fill once, never return
       │   ├── Stackmates auth                  │   ├── Identity & Access blocked
       │   └── Convex real-time data layer      │   └── "Self-reflection feels cringe"
       │
       └── Success measures (binary)
           ├── ≥ 10 external users fill a grid ─── YES / NO
           ├── D7 return rate > 35% ─────────── YES / NO
           ├── Grid completion > 60% cells ──── YES / NO
           └── ≥ 3 grids shared externally ──── YES / NO

═══════════════════════════════════════════════════════════════════════

Success is defined. Where does the current process fail? ↓

2 of 5

Where does time die?

VALUE STREAM MAP
═══════════════════════════════════════════════════════════════════════

  [Too many priorities — new venture, quarter, crisis]
      │
      ▼
  1. CAPTURE          60 min    wait: 0        50% complete & accurate
  Write everything    ─────────────────────────────────────────────────
      │
      ▼
  2. COMPRESS          30 min    wait: 1-3 DAYS  30% complete & accurate
  Pick what matters.  ─────────░░░░░░░░░░░░░░──────────────────────────
  Energy drops.            energy drops, no structure forces completion
      │
      ▼
  3. DOCUMENT          3 hrs     wait: 1-3 DAYS  20% complete & accurate
  Slides, plan.       ─────────░░░░░░░░░░░░░░──────────────────────────
  Blank page.              procrastination, blank page problem
      │
      ▼
  4. SHARE             30 min    wait: 3-7 DAYS  40% complete & accurate
  Present to team     ─────────░░░░░░░░░░░░░░░░░░░░░░░░───────────────
                           scheduling, format mismatch
      │
      ▼
  5. UPDATE            never     wait: ∞          0% complete & accurate
  Always fails.       ──────────────────────── STEP 5 NEVER HAPPENS ──
      │
      ▼
  [Frozen artifact. Clarity decays. Repeat next quarter.]


  ┌─────────────────────────────────────────────────────────────────┐
  │  Cycle time:  ~5 hours         Flow efficiency: ~2%            │
  │  Wait time:   ~11 days         World-class: >40%               │
  │  Lead time:   ~16 days         THE WASTE ISN'T CREATION.       │
  │                                IT'S DECAY.                     │
  └─────────────────────────────────────────────────────────────────┘

═══════════════════════════════════════════════════════════════════════
2% flow efficiency. Step 5 never happens. The instrument fixes Step 5.

The bottleneck is clear. What blocks the fix? ↓

3 of 5

What blocks the fix?

DEPENDENCY MAP
═══════════════════════════════════════════════════════════════════════

                              START
                                │
               ┌────────────────┼────────────────┐
               │                │                │
               ▼                ▼                ▼
       ┌──────────────┐  ┌──────────────┐  ┌──────────────┐
       │  Identity &   │  │  CDD Proto-  │  │  Figma       │
       │  Access       │  │  type        │  │  Template    │
       │  ═══ HARD     │  │  (exists)    │  │  (exists)    │
       │  BLOCKED      │  └──────┬───────┘  └──────┬───────┘
       └──────┬───────┘         │                 │
              │                 └────────┬────────┘
              ▼                          │
       ┌──────────────┐                  │
       │  Auth Wiring  │                  │
       │  2 days       │                  │
       └──────┬───────┘                  │
              │                          │
              ▼                          ▼
       ┌──────────────┐          ┌──────────────┐
       │  Convex       │          │  Grid Engine  │
       │  Persistence  │          │  3 days       │
       │  ═══ HARD     │          │  (from proto) │
       │  2 days       │          └──────┬───────┘
       └──────┬───────┘                 │
              │                         │
              └────────┬────────────────┘
                       │
                       ▼
               ┌──────────────┐
               │  Cell Editor  │
               │  3 days       │
               └──────┬───────┘
                      │
                      ▼
               ┌──────────────┐
               │  Mode Toggle  │
               │  2 days       │
               └──────┬───────┘
                      │
          ┌───────────┴───────────┐
          ▼                       ▼
   Sprint 1 (5d)           Sprint 2 (5d)
   Card + Scale +          Snapshots +
   Highlighting            Templates + Share
          │                       │
          └───────────┬───────────┘
                      ▼
               User Testing
               5 pilot users


  ═══ = HARD (cannot proceed without)
  ─── = Soft (can proceed with mocks or exists)

  Critical path: ~22 engineering days + Identity fix wait

═══════════════════════════════════════════════════════════════════════

Two hard blockers. Everything else exists or is soft. What can we build with? ↓

4 of 5

What can we build with?

CAPABILITY MAP
═══════════════════════════════════════════════════════════════════════

  READY (maturity 3+)                      TO BUILD (maturity 0)
  ──────────────────                        ─────────────────────
  Domain Content (1,200+ pages) █████ 5     Cell Editor           ░░░░░ P1
  Email Delivery (Resend)       █████ 5     Convex Persistence    ░░░░░ P1
  Figma Template                ████░ 4     Mode Toggle           ░░░░░ P2
  Stackmates Auth               ████░ 4     Card View (Stack)     ░░░░░ P2
  CDD Prototype (5 patterns)   ███░░ 3     Scale Selector        ░░░░░ P2
  Convex DB                     ███░░ 3     Empty Cell Highlight  ░░░░░ P2
  Grid UI (Mission Control)    ███░░ 3     Snapshot System       ░░░░░ P2
                                            Template Engine       ░░░░░ P3
  7 capabilities ready                     Share / Export         ░░░░░ P3
                                            AI Coaching           ░░░░░ P3

                                            10 capabilities to build


  ┌─────────────────────────────────────────────────────────────────┐
  │  60% composition (wire existing pieces)                        │
  │  40% new code (persistence + production UI)                    │
  │  The sprint is wiring, not invention.                          │
  └─────────────────────────────────────────────────────────────────┘

═══════════════════════════════════════════════════════════════════════

The pieces exist. How does the instrument bring them to life? ↓

5 of 5

How does the instrument work?

The PromptDeck is a navigation instrument. The A&ID names it in the system language.

AGENT & INSTRUMENT DIAGRAM
═══════════════════════════════════════════════════════════════════════

  AGENTS                                    INSTRUMENTS
  (who applies force)                       (what verifies and rewards)
  ──────────────────                        ───────────────────────────
  User (Human)                              Gap Highlighter
    fills, reflects, returns weekly           empty cells = strategy

  Deck Engine (System)                      Snapshot Comparator
    persists, highlights, snapshots           this week vs last week

  AI Coach (V3, future)                     Mode Lens
    suggests questions for gaps               pep talk ↔ pitch


  THE FILL LOOP
  ─────────────────────────────────────────────────────────────────

   FILL ──→ GAPS ──→ QUESTIONS ──→ RESEARCH ──→ UPDATE ──→ COMPARE
     │         │                       │            │           │
     │    Gap Highlighter           Domain        Deck      Snapshot
     │    shows what's              Content      Engine    Comparator
     │    missing                                   │           │
     └──────────────────────── FEEDBACK ←───────────┴───────────┘
                               grid sharpens each pass


  FOUR LOOPS, FOUR FREQUENCIES
  ─────────────────────────────────────────────────────────────────

  SESSION   Fill → see gap → fill next → complete          instant
  WEEKLY    Return → snapshot → compare → update           minutes
  MODE      Pep talk → pitch → see misalignment → refine   minutes
  COMPOUND  Many snapshots → patterns → deeper five        days


  HORIZON
  ─────────────────────────────────────────────────────────────────

  H1  Prompt Deck ──→  WHAT matters, WHERE gaps are
                 │
  H2  Time+Mind  ──→  closes the gap between WHAT and DID
                 │
  H3  AI Coach   ──→  fills what you can't see alone

═══════════════════════════════════════════════════════════════════════

Five maps. The outcome names success. The value stream exposes the waste. The dependencies show what blocks. The capabilities show what exists. The A&ID names the instrument that fixes it all.

Questions

If the diagram doesn't make the engineer say "I can build this" — is the diagram wrong or the idea?

  • Which map revealed something the PromptDeck slides didn't say?
  • When the value stream shows 2% flow efficiency, does that validate the pain or expose a gap in the solution?
  • Does the A&ID name the PromptDeck as an instrument that compounds — or just a tool that stores?