Factory Velocity

How fast is the factory shipping — and how good are the forecasts?

19.1%

coverage

calibrating
L4: 0
L3: 10
L2: 27
L1: 8
234 total

Features Advanced

44

of 230 total (L1+)

PRDs Active

21

1 shipped, 7 at L2+

Run Rate

calibrating

need 2+ snapshots

Forecast Accuracy

6d

1 resolved, 100% on time

Factory Inventory

Features

230

in the feature matrix

PRDs

15 active

6 shipped, 20 backlog

Ventures

8

venture experiments

Work Charts

13

4 with validation schemas

PRD Throughput

Every PRD is a work order. Status shows how far each has progressed.

PRDCategoryStatusScoreBand
Project Management Systeminner-loopL2-partial3.0ship
CLI Platforminner-loopL43.0ship
Sales CRMproductL2-L32.9prepare
ETL Data ToolproductL22.8prepare
RFP EngineproductL22.7prepare
Multi-Tenant RoutingproductL02.6prepare
Agent Platforminner-loopL22.6prepare
Protocol CoverageproductL02.5prepare
Prompt DeckproductL12.5prepare
Decision Tracerinner-loopL02.5prepare
Solar RFP PipelineproductL02.5prepare
Marketing SitesproductL02.4prepare
Sales Dev AgentproductL22.3prepare
Prediction Game (Sui)productL02.3prepare
Autoresearch Loopinner-loopL02.1prepare
Better PracticeproductL01.9incubate
Design SystemproductL01.9incubate
Automated Commissioninginner-loopL01.6incubate
Demand Signal ScoringproductL01.5incubate
Time + MindproductL01.5incubate
Admin PortalproductL00.7park

Delivery Forecasts

Prediction accuracy: what we said vs what happened. Need 3+ resolved forecasts for meaningful accuracy.

Mean Error

6 days

On Time (≤7d)

100%

Bias

late

ForecastTargetActualDelta
CLI Platform to L42026-03-152026-03-21+6d
Sales CRM to L32026-04-15open
Agent Platform to L32026-04-30open

Level Distribution

LevelCount%Meaning
L400%Commissioned
L3104%Tested
L22712%UI connected
L183%Schema + API
L018981%Spec only

Questions

If the run rate doubles after adopting generators, what does that prove about the factory model?

  • Which is more valuable: shipping 10 features to L1 or advancing 3 features to L4?
  • If forecast accuracy stays above 80%, what does that tell you about the planning process?
  • What would make the acceleration indicator the most important number on this page?
  • When coverage reaches 50%, does the run rate naturally slow — and should it?